Silver One Resources

Website: silverone.com
Primary ticker: TSXV:SVE, OTC:SLVRF, FF:BRK1
Stage of development: Exploration, Development
Primary minerals: Silver
Project to promote: Candelaria Mine

Live financials

Silver development company with 5 properties in Nevada and Mexico. Flagship property is the past producing Candelaria mine in Nevada (historic production 1200 g/t) with historic resource of 46m M&I and 84m Inferred silver equivalent ounces. Leach pads hold 48m ounces at .40g/t with potential near to mid-term production. High grade opportunities along 1-2km strike length west of historic pits. Cherokee project in Nevada is 100% owned, an epithermal high-grade silver-gold-copper vein system traced over 12km strike length.
Proven management team with extensive background in large-scale development projects. Backed by industry-leaders Eric Sprott, First Majestic, SSR Mining, and First Mining Gold.

Management Profile

Greg Crowe – President & CEO

Greg Crowe, President & CEO has over 30 years’ experience in the exploration and mining sector. This includes extensive exposure to precious and base metal projects throughout North and South America, Asia and Africa. Mr. Crowe has worked with major mining companies and has served as a Director and Executive of several junior and development stage resource companies.
From 2002 until late 2015, Mr. Crowe was President and CEO of Entrée Gold Inc. He was instrumental in transforming Entrée from an early stage exploration play to one with an advanced development-mining project in joint-venture with Rio Tinto and its partner company, Turquoise Hill Resources


What is your rationale for attending 121 Mining Investment?

We are attending the 121 conference to share new company developments, and to continue to increase our investor base.


What recent news would you like to highlight to investors attending?

Silver One is currently in the midst of a drill program to upgrade the historic resource to a 43-101 compliant resource. Exploration drilling is also occurring along strike at the Candelaria mine to further define the size, dimensions and grade of the underground resource. More development is occurring at both Candelaria and Cherokee with airborne, geophysics and metallurgic testing. Testing to define the most profitable method of production for the surface resource is continuing.


What are your key goals for the next 3, 6 and 12 months?

3 Months:
Announce results of drilling and testing.

6 Months:
Define most profitable mining method for heap leach resource

12 Months:
Initiate permitting and development of milling operations.


What do you see as the key risks and challenges facing your company at the moment and how are you overcoming these?

Developing the production plan at Candelaria for maximum profitability through analyzing and testing multiple production scenarios. Defining additional high grade resources at Candelaria. Developing Cherokee into a district scale property with significant resources.


In a sentence, what do you think makes your company such a compelling investment?

Silver One has the potential to be in production with the heap leach material in 2-3 years. Longer term high grade potential can continue the mine life beyond the 8 years of the heap leach production at Candelaria. The Cherokee project is early stage, but is very promising of becoming a new mining district with high grade silver, gold and copper in a 12km strike length.