Electric Metals USA

Electric Metals 300x200

Primary tickers: TSXV:EML, OTCQB:EMUSF

Stage of development: Exploration, Development
Primary mineral: Manganese
Project to promote: The Emily Manganese Project

Project location: Minnesota, USA

Website: electricmetals.com

Corporate presentation: Click here

Electric Metals has the highest-grade manganese deposit in North America and is poised to emerge as the low-cost producer of 100% domestically sourced, high-purity manganese sulphate monohydrate (HPMSM).

 

Electric Metals (USA) Limited (TSXV:EML) is a Canadian-listed, development company focused on

producing metals crucial for driving the electrification of mobility, facilitating the green energy transition, and supporting energy storage solutions.

 

The company’s flagship asset is the Emily Manganese Project in Minnesota, USA, which contains North America’s highest-grade manganese deposit. Manganese is a key metal in the EV battery / energy storage revolution due to its prominent role in lithium-ion battery formulations.

 

Major Shareholders:

Board And Insiders – 36.9%

Financials

Management Profile

MR. BRIAN C SAVAGE – CEO, Director

 

Mr. Savage is an entrepreneurial business executive with a long history of identifying, building, growing, and transforming mining and metals businesses throughout the world. His expertise extends across commodity and capital markets, organizational development, and strategic growth initiatives, including mergers, acquisitions, and joint ventures. Mr. Savage has founded and co-founded several businesses focused on developing and advancing mining operations in challenging jurisdictions, including Kazakhstan, Ukraine, Russia, Guinea, and the Democratic Republic of the Congo (DRC). His recent experience in the DRC has allowed him to develop a profound understanding of the manganese markets including the production of high-value, high-purity manganese products for the electric vehicle and enery storage markets. Mr. Savage earned a Bachelor of Science degree in Mining Engineering and a Master of Science degree in Mineral Economics from the Colorado School of Mines.

What recent news would you like to highlight to investors attending?

Apr 22, 2024 – Electric Metals (USA) Limited Updates Emily Manganese Deposit Metallurgical Test Work

 

Apr 10, 2024 – Electric Metals (USA) Limited Engages ICP Securities Inc. For Automated Market Making Services and Senergy Communications Capital Inc. For Digital Marketing and Advertising Services

 

Apr 9, 2024 – Electric Metals (USA) Limited Receives Expanded Mineral Resource Estimate for the Emily Manganese Project, Minnesota. The Highest-Grade Manganese Deposit in North America.

 

Mar 11, 2024  Electric Metals (USA) Limited Announces Appointment of Brian Savage as Director

 

Feb 1, 2024  Electric Metals (USA) Limited Announces Appointment of Chief Executive Officer

 

Dec 6, 2023  Electric Metals announces resignation of Chief Executive Officer

 

Nov 22, 2023  Electric Metals (USA) Limited announces option and acquisition agreement for the sale of Nevada silver assets to Altair Resources Inc.

What are your key goals for the next 3, 6 and 12 months?

3 months:

 

– Design drill program to upgrade to measured resources and obtain other technical data

– Initiate minerology, ore characterization, crushing, and grinding studies for mine design and environmental studies

– Advance metallurgical test work, flow sheet assessment, and initial production of commercial chemical products for product development

– Initiate scoping study for processing plant design, including site identification

– Initiate baseline environmental studies for Emily site

– Continue to engage stakeholders, foster transparency, and build support for the project

6 months:

 

– Undertake geological, geotechnical and environmental drilling program at Emily

– Optimize ore characterization, crushing, and grinding parameters for mine design

– Initiate scoping study on preliminary mine design

– Develop mine permitting plan and initiate ore and waste characterization studies

– Complete scoping study for processing plant design and site location

– Optimize processing plant design and initiate pre-feasibility study for processing plant

– Continue to engage stakeholders, foster transparency, and build support for the project